-
- Downloads
[IMP] stock: Remove domain on source/destination on Operation Details
When doing an internal trasnfer, you can choose any destination location in the header, but not on the line This is problematic when doing a pick-pack-ship transfer. For the pick move, you may want to change the source destination location (maybe another warehouse why not) but as the transfer is already validated you cannot modify it on the form. But with the Operation Details (Pencil button) you can modify the source/destination location. The only problem is that a domain is forcing the user to choose a source destination that is a child of the source destination on the transfer, which makes impossible to choose a destination on another warehouse. This tool is pretty much advanced, so we don't need to be so restrictive.
Loading
Please register or sign in to comment