-
- Downloads
[FIX] mrp: do not recompute duration expected
Since 2515482d, the duration expected of a workorder was always set to the real duration at the validation of the workorder. This commit ensure the duration expected is left unchanged even if the date_planned_finished is updated. closes odoo/odoo#108462 Opw: 3008089 X-original-commit: 61771743 Signed-off-by:William Henrotin (whe) <whe@odoo.com>
Loading
Please register or sign in to comment