Skip to content
Snippets Groups Projects
Unverified Commit dd664061 authored by Martin Trigaux's avatar Martin Trigaux
Browse files

[FIX] mrp: include workcenter cost in total cost

Estimate the workcenter cost based on produced quantity so far.
The workcenter cost is written on analytic accounts at the end of the production
only. A new method _compute_costs_from_production is needed to estimate the
workcenter total cost and then divide by the produced unit.

opw-675994
parent bc23c92c
Branches
Tags
No related merge requests found
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Please register or to comment