-
- Downloads
[FIX] mrp: include workcenter cost in total cost
Estimate the workcenter cost based on produced quantity so far. The workcenter cost is written on analytic accounts at the end of the production only. A new method _compute_costs_from_production is needed to estimate the workcenter total cost and then divide by the produced unit. opw-675994
Loading
Please register or sign in to comment